After Chris helped me get the feed into the shop and scooped into the cans, I went to work on our new composter. I started it last Sunday but didn't get too far. Today, I got it finished. I still have to finish the water-proofing, but the building is done. I'm not one of those proud people that likes to toot her own horn, but I was proud as a peacock with this thing. The only thing I had any help with was cutting the 4x4's. Cutting everything else, nailing, yada yada...all me. I think it came out really well. It's 12' long and 3' deep, built using 2x6 and 2x4 with each outer corner being a 4x4.
Looking at it in the shop all finished reminds me of the man who built a boat in his basement and couldn't get it out. In my defense, Chris said to build it in there so that I could get it stained even if it was raining. He has this blind faith in the old Allis Chalmers out there. According to him it can do or move anything (and so far it has). We shall see. I may be composting in his work-shop come spring. Doesn't leave me much room for the next several projects though!
The very beginning. Excuse the mess!
What a helper! That's about as far as last weekend got me.
Ahhhh.
Hopefully the deck sealer will be a little added protection.
Not too bad for a girl...lol.
God Bless!